Lindos Diy Pyramid Hip Roof Gazebo (14' x 14')

Price
$4,999.99
For items that shows the (ADD TO CART) 5 to 10 Business days delivery to your driveway. For (Pre-Order) 8 to 10 weeks delivery to your driveway.

Do-it-yourself: Pyramid roof gazebo with Larch Douglas fir wood and 6" x 6" post. 

Including construction description, where you tailor everything yourself.

 

Finishing fine sawn
Treatment untreated
Type of roof pyramid hip roof
Wood type larch/douglas fir
Package size length 430,00 cm
Package size width 150,00 cm
Package size height 80,00 cm
Ring beam size Depth 15,00 cm
Post size Width 15,00 cm
Ring beam size Width 5,00 cm
Roof Shingles included no
Cut to size by customer Yes
Installation hardware included Yes
Post size Depth 15,00 cm
Depth 430,00 cm
Width 430,00 cm
Drying undried
Included Including screws
Core-free Yes
Beam size width Width 5,00 cm
Ridge height 375,00 cm
Number of columns 4
Package weight 500,00 kg
Beam size width Depth 15,00 cm
Walk-through dimensions Height 230,00 cm
Shipping Information

Our online store is open 24/7 and we ship our orders from Monday to Friday, excluding holidays. Orders that are received before 12 pm EST will be shipped out the next business day. However, products that have a shipping restriction on their page will be shipped out within the time frame listed.

Shipping times are 5 to 10 business days for items in stock and 8 to 10 weeks for pre-order items.

Place An Order

Place an order:

Pre-Order items you can purchase the items on our website with a 50% down payment or you can contact us by

emailing info@euroluxlife.com or calling 1-888-627-1970.

Let us know your desired outdoor structure and color choices. All custom orders take from 8-10 weeks to complete from the time down payment is processed. However, in-stock items are available for immediate purchase and delivery.

 

Choose a payment option: 

After contacting us to confirm your order you can either pay by Cheque, Credit Card (via our online store), or Cash. A 50% deposit is due immediately before the building process. The remaining is due once the building construction is complete and ready for delivery.

You may also like